Skip to content
0466 380 803
info@certitudesurveys.com.au
Home
About
Services
Engineering Surveying
BIM Services
GIS & App based Services
Aerial Surveys
Laser Scanning
Survey Control
Land Surveying
Planning and Estimating
Projects
Blog
Contact
Menu
Home
About
Services
Engineering Surveying
BIM Services
GIS & App based Services
Aerial Surveys
Laser Scanning
Survey Control
Land Surveying
Planning and Estimating
Projects
Blog
Contact
Projects
Granny Smith Mine – Tailings Dam Raise & New Cell
Complete Tailings dam embankment level raise
Design various ramps and rock reinforcement structures
Ongoing auditing role on new cell construction
Western Turner Syncline 2
13km long conveyor & primary crusher
Primary control
Concrete & Civil surveying
Audit Surveying
Ord North Main Roads Realignment & Widening
8km long section of Great Northern Hwy in Kimberley
Earthworks and culverts
Replace, widen and tie into existing road in different sections
Use of UAV for volumes
GPS & TPS Machine Control
MRWA Bow River Bridge Replacement
250m long concrete road bridge
1.5km new road alignment
Guide bank abutments
GPS Machine Control
Westonia Gold Mine Upgrade
Upgrade processing facilities with new structures
Tie into existing structures
Concrete & civils
Commercial & Residential
Footings, slabs & structural
Piling
Drainage & sewerage
Site levels
Yandi Barimunya Airstrip
Aerodrome Earthworks remediation & re-level
Extensive UG Services avoidance
TPS machine control
Byford Rail Level Crossing
Replacement (Metronet)
Replace & Realign track
New crossing, boom gates & signalling equipment
New underground services
Hamilton St Bridge Replacement over Rail
New bridge structure
Piled substructure
Design piling mats
Monitor live rail