Projects

Granny Smith Mine – Tailings Dam Raise & New Cell

  • Complete Tailings dam embankment level raise
  • Design various ramps and rock reinforcement structures
  • Ongoing auditing role on new cell construction

Western Turner Syncline 2

  • 13km long conveyor & primary crusher
  • Primary control
  • Concrete & Civil surveying 
  • Audit Surveying 

Ord North Main Roads Realignment & Widening 

  • 8km long section of Great Northern Hwy in Kimberley
  • Earthworks and culverts
  • Replace, widen and tie into existing road in different sections 
  • Use of UAV for volumes
  • GPS & TPS Machine Control 

MRWA Bow River Bridge Replacement 

  • 250m long concrete road bridge 
  • 1.5km new road alignment
  • Guide bank abutments 
  • GPS Machine Control

Westonia Gold Mine Upgrade

  • Upgrade processing facilities with new structures
  • Tie into existing structures
  • Concrete & civils 

Commercial & Residential

  • Footings, slabs & structural
  • Piling
  • Drainage & sewerage
  • Site levels 

Yandi Barimunya Airstrip

  • Aerodrome Earthworks remediation & re-level
  • Extensive UG Services avoidance 
  • TPS machine control 

Byford Rail Level Crossing

  • Replacement (Metronet)
  • Replace & Realign track
  • New crossing, boom gates & signalling equipment
  • New underground services 

Hamilton St Bridge Replacement over Rail

  • New bridge structure
  • Piled substructure
  • Design piling mats
  • Monitor live rail